What is should-cost modeling?
If your negotiation starts with a supplier’s quote, you are always negotiating from their number. A should-cost model gives you your own.
Quick answer
Should-cost modeling is the practice of independently calculating what a product or service should cost — based on materials, labor, overhead, and margin — before comparing that figure against a supplier’s quote.
According to GEP, should-cost analysis has become standard practice among best-in-class procurement and supply chain organizations precisely because it changes the negotiation from a price discussion into a cost discussion.
If your negotiation strategy starts with a supplier’s quote, you are always negotiating from their number, not yours. That is the position most procurement teams are stuck in — reacting to whatever price lands in the RFQ response, with no independent basis to push back. Should-cost modeling flips that: it gives your team a defensible, data-built estimate of what a product or service should actually cost, so the negotiation starts from evidence instead of leverage alone. This guide covers what a should-cost model actually contains, how to build one, and where it pays off most in energy and industrial procurement.
What is should-cost modeling?
Should-cost modeling is the process of building an independent cost estimate for a product or service from its underlying cost drivers, rather than accepting a supplier’s quoted price at face value. The model typically breaks a category down into raw material cost, labor and processing time, overhead allocation, logistics, and a reasonable supplier margin. Once assembled, that should-cost figure becomes the baseline your negotiation team works from — not the number the supplier proposed. It is a core technique in strategic sourcing, and increasingly common in should-cost analysis programmes across capital-intensive industries where a single contract can carry millions in avoidable premium.
How does should-cost modeling differ from price benchmarking?
Price benchmarking compares what others have paid; should-cost modeling calculates what the item should cost regardless of what anyone has paid before. The distinction matters because benchmarks can be inflated across an entire market — if every supplier is overpricing a category, benchmarking just confirms the inflated number as normal.
- Basis. Benchmarking rests on historical prices paid and market data. Should-cost rests on underlying cost drivers — materials, labor, overhead.
- Best for. Benchmarking suits commodities with transparent, liquid markets. Should-cost suits complex, custom, or opaque-margin categories.
- Risk. Benchmarking inherits market-wide overpricing. Should-cost requires accurate cost-driver data.
- Negotiation posture. Benchmarking says “others pay less”. Should-cost says “here is what this should cost, and why”.
Most mature procurement functions use both — benchmarking for fast categories, should-cost modeling where the stakes and complexity justify the extra rigour.
What cost elements go into a should-cost model?
A complete should-cost model separates a price into five components: materials, labor, overhead, logistics, and margin. Each is estimated independently, then summed to produce the target cost.
- Materials: raw input costs, indexed to current commodity prices where relevant.
- Labor: hours required multiplied by a realistic regional or role-based rate.
- Overhead: a supplier’s facility, equipment depreciation, and administrative allocation.
- Logistics: freight, customs, and handling from origin to point of use.
- Margin: a reasonable profit allowance — not zero, but not whatever the market will bear either.
How do you build a should-cost model step by step?
Building a should-cost model follows five steps: select the category, decompose the cost structure, source input data, validate the model, and use it in negotiation.
- Select high-impact categories first. Prioritise by spend and complexity — the Pareto principle applies here as it does in most procurement diagnostics.
- Decompose the cost structure into the five elements above for the specific product or service.
- Source reliable input data — commodity indices, labor rate surveys, freight benchmarks, or internal engineering estimates.
- Validate against known data points, such as past invoices or a category where you already have cost transparency.
- Bring the model into the negotiation as the opening position, not a fallback if talks stall.
Where does should-cost modeling deliver the most value in energy procurement?
Should-cost modeling pays off most in categories where specifications are complex and supplier margins are opaque — exactly the profile of most drilling services, EPC packages, and long-cycle equipment contracts in oil, gas, and energy infrastructure. Unlike a retail commodity with a public spot price, these categories rarely have transparent market benchmarks, which is precisely why a from-first-principles cost model carries so much negotiating weight.
It also complements a broader cost-and-value programme: should-cost modeling strengthens the rates lever, while specification and efficiency work capture the remaining share of the value that most cost programmes leave on the table — the pattern examined in why rate cuts miss 70 percent of savings potential.
What are the common pitfalls when implementing should-cost models?
- Treating the model as a one-time exercise rather than updating it as input costs shift.
- Using stale or generic labor and material rates instead of region- and category-specific data.
- Presenting the model as an ultimatum rather than a starting point for a fact-based conversation.
- Skipping validation against any real data point, which lets small assumption errors compound into a model nobody trusts.
- Building models only for direct materials and ignoring services categories where the same logic applies.
Frequently asked questions
Is should-cost modeling the same as target costing?
No. Target costing starts from a price the market will bear and works backward to a design. Should-cost modeling starts from actual cost drivers — materials, labor, overhead — and builds a fair price forward, independent of what a supplier chooses to quote.
How accurate does a should-cost model need to be to be useful?
A model within 5-10% of actual cost is usually accurate enough to change a negotiation. The goal is not a perfect number — it is a defensible one that shifts the conversation from a quoted price to a cost structure the supplier has to respond to.
Can should-cost modeling work for services, not just materials?
Yes. Service categories substitute labor hours, skill-level rates, and overhead ratios for materials and freight. It is harder to benchmark than physical goods, but the same should-cost logic applies to contract labor, maintenance, and technical services.
How often should a should-cost model be updated?
Revisit it whenever a major cost input moves — steel, freight rates, energy prices — or at minimum once a year for recurring categories. Contracts with price-adjustment clauses should have models refreshed on the same cycle as the clause triggers.
Do you need special software to build a should-cost model?
No — a well-structured spreadsheet with reliable cost-driver data is enough to start. Dedicated should-cost or spend-analytics software helps at scale, mainly by automating data collection and market-index updates, not by changing the underlying method.
Summary
- Should-cost modeling builds an independent cost estimate from materials, labor, overhead, logistics, and margin — not from what a supplier quotes.
- It delivers the most value in complex, opaque-margin categories like drilling services and EPC packages, where public benchmarks do not exist.
- A model does not need to be perfect to be useful — it needs to be defensible enough to change the negotiation.
See it working — book a demonstration
Continue reading: Cost & Value Intelligence — the philosophy behind cost and value decisions.
Related service: should-cost based tendering. Overview: oil and gas procurement.